Client
K10 Properties Pte. Ltd
Building Area
2,000 Sq. m
Location
Melbourne, Australia
LOD
LOD 300
Scope
AOG Church is a project invested by the Hephzibah Community. The scope of the project involves the Architecture & Structure Modelling at an LOD 300 and the extraction of SD/ DD set drawings from 3D model.
Challenges
The crucial challenge was to get the design approved by the client. There were major design revisions which adversely affected the planned project schedule as most of the design changes were mentioned on call or there were no proper communication channel established.
We brought in a cloud based review session into the project, and the design changes were discussed on the live meeting with better tracking and documentation by the assigned document controllers. This opens a better work‐flow improving the design & coordination process.