Client

MEP Contractor

Built-up Area (BUA)

12,000 Sq. m

Location

Ireland

LOD

LOD 300

Description

One Haddington is a commercial building project in Ireland. The scope of the project involves the Architecture & Structure Modelling at an LOD 200 and MEP model to be delivered in LOD 300 along with the extraction of drawings from 3D model.

What’s the Challenge?

Challenge 1: Repeated Design Changes

The crucial challenge was to get the design approved by the client. There were major design revisions which adversely affected the planned project schedule as most of the design changes were mentioned on call or there were no proper communication channel established.

We brought in a cloud based review session into the project, and the design changes were discussed on the live meeting with better tracking and documentation by the assigned document controllers. This opens a better work-flow improving the design & coordination process.

Our Value Addition

The 3D visualization capability helps to identify the critical design issues in the early design phase of the project. The constructability issues which may occur due to use of precast concrete in the project was also taken into consideration.

What our Client Says?

“The experience was remarkable. There were a few misunderstandings along the way, but when brought up they were immediately resolved. The service was fast and the models are exactly what we were looking for.”  
- John Wilfred, Job Captain