Client

MEP Contractor

Built-up Area (BUA)

12,000 Sq. m

Location

Ireland

LOD

LOD 300

About the Project

One Haddington is a commercial building project in Ireland. The scope of the project involves Modeling, Clash Detection, BIM Coordination and the preparation of Construction Drawings. For the modeling, our scope extends to the Architecture & Structure Modeling at LOD 200 and MEP model to be delivered in LOD 300.

Key Challenges & Solutions

Challenge 1: Repeated Design Changes

The crucial challenge was to get the design approved by the client. There were major design revisions that adversely affected the planned project schedule as most of the design changes were mentioned on call or there was no proper communication channel established.

We brought in a cloud based review session into the project, and the design changes were discussed on the live meeting with better tracking and documentation by the assigned document controllers. This opens a better work-flow improving the design & BIM Coordination process.

Our Value Addition

The 3D visualization capability helps to identify the critical design issues in the early design phase of the project. The constructability issues which may occur due to the use of precast concrete in the project was also taken into consideration.

What our Client Says?

"I have a wonderful working relationship with BIMEX Engineers. The team were receptive to our inputs and their model and drawings have always met the required standards."
- Kevin O' Dwyer, BIM Manager